Project Datasheet

Bridges Market Sector

Project: Baltic Millennium Bridge  

For more details please contact:

Peter Miller
Director
Watson Steel Structures Ltd
+44 (0) 1204 696 675
enquiries@watsonsteel.co.uk
Client: Gateshead M B C
Location: Gateshead
Tyne and Wear
Country: England
Partners: Main Contractor: Harbour and General Works Ltd
Consulting Engineer: Gifford & Partners
Architect: Wilkinson Eyre
Statistics: Total Tonnage: 942 tonnes
Programme: 
Completion Date:  June 1999
Overview:

This spectacular 105 metre span footbridge was constructed in Howden Yard on the River Tyne some 5 miles from the final location. The bridge sections were welded together in the fabrication yard and the joints ground smooth. The site applied paint is a gloss flake epoxy system. The completed bridge weighing 800 tonnes was then picked up and carried up the river using one of the worlds largest floating cranes.

Watson Steel were responsible for the complete bridge along with the hydraulically controlled operating mechanism.

       